What does Law 318/2023 allow?

Before the law, selling or sharing electricity outside Electricité du Liban (EDL) had no clear legal basis. Law 318/2023 creates two routes for distributed renewables up to 10 MW: net metering with EDL, and peer-to-peer supply between private parties[1][2].

Table 1. Arrangements under Law 318/2023
Arrangement How it works Typical user
Individual net metering One system and one EDL meter; surplus exported to the grid is credited against consumption Homes, businesses, institutions
Multiple-tenant net metering One system shared by several meters in the same building Residential and mixed-use buildings
Collective net metering One system serving several consumers at different locations Municipalities, groups of users
Peer-to-peer supply A private producer sells renewable electricity to a consumer through a direct contract or equipment lease Developers and large consumers

Source: Law 318/2023 summaries[1][2]. Detailed procedures depend on implementing rules.

Who oversees the law?

The law gives the Electricity Regulatory Authority responsibility for monitoring and licensing. Its board was appointed in September 2025[3]. Procedures under the law are still being put in place, so owners should check the current EDL and regulator requirements before relying on any arrangement in a financial case.

What should an owner check before investing?

  1. Confirm which arrangement fits the site: individual, multiple-tenant, collective or peer-to-peer.
  2. Check the current EDL procedure for metering, connection and approvals.
  3. Size the system on your own consumption first, and treat export credit as upside until procedures are tested.
  4. For peer-to-peer supply, have the contract reviewed for tariff, term, liability and exit terms.
  5. Keep design, metering and commissioning records, which any approval will require.

How does the law change solar feasibility studies?

A feasibility study should now state which arrangement it assumes and test the case with and without export credit. Export credit matters only when a site produces more than it uses while the grid is available, which in Lebanon depends on supply hours. Sites with daytime loads often use most of their solar output directly, so the case rarely depends on export alone. See the guide on solar PV feasibility studies in Lebanon.

Where independent support helps

Independent advice helps owners and municipalities choose an arrangement, size the system and prepare the technical file. Otibara has assessed renewable energy policy and markets in Lebanon and supports solar projects from feasibility to commissioning.

Common questions

Is net metering working in Lebanon today?

The law provides for it[1]. How it works in practice depends on EDL procedures and the regulator's rules, so check the current status for your connection.

What is the size limit under Law 318/2023?

The law covers distributed renewable systems up to 10 MW[1].

Does the law cover technologies other than solar?

Yes. It covers distributed renewable energy in general, although solar PV is by far the most common technology installed in Lebanon[1].

Can a neighbour or tenant buy my solar electricity?

Peer-to-peer supply between private parties is allowed under the law through direct agreements or leasing, subject to its conditions and implementing rules[1].

References

  1. Law No. 318 of 2023, Distributed Renewable Energy Production Law, summary on FAOLEX and UNEP LEAP, accessed October 2026.
  2. Lebanese Center for Energy Conservation (LCEC), Decentralized Renewable Energy Law, lcec.org.lb, accessed October 2026.
  3. MEDREG, MEDREG welcomes the creation of the Lebanese Electricity Regulatory Authority, 22 September 2025.